2 Removing trailing traverses...
4 Concatenating traverses...
10 Calculating traverses...
12 Calculating trailing traverses...
14 Calculating statistics...
16 Survey contains 4 survey stations, joined by 0 legs.
18 Survey has 4 connected components.
19 Total length of survey legs = 0.00m ( 0.00m adjusted)
20 Total plan length of survey legs = 0.00m
21 Total vertical length of survey legs = 0.00m
22 Vertical range = 1.00m (from 4 at 1.00m to 3 at 0.00m)
23 North-South range = 1.00m (from 3 at 1.00m to 4 at 0.00m)
24 East-West range = 1.00m (from 2 at 1.00m to 4 at 0.00m)