NEWS: Remove inaccurate claim for 1.4.2
[survex.git] / tests / nomeasure.out
blobf51c55d0807e6ff835429a8e7d0e9c4970bc29f8
1 Survey has no fixed points. Therefore I've fixed C1 at (0,0,0)
3 Removing trailing traverses...
5 Concatenating traverses...
7 Simplifying network...
9 Calculating network...
11 Calculating traverses...
13 Calculating trailing traverses...
15 Calculating statistics...
17 Survey contains 4 survey stations, joined by 3 legs.
18 There are 0 loops.
19 Total length of survey legs =    4.00m (   4.00m adjusted)
20 Total plan length of survey legs =    4.00m
21 Total vertical length of survey legs =    0.00m
22 Vertical range = 0.00m (from C4 at 0.00m to C4 at 0.00m)
23 North-South range = 6.00m (from C4 at 6.00m to C1 at 0.00m)
24 East-West range = 0.00m (from C4 at 0.00m to C4 at 0.00m)
25    2 1-nodes.
26    2 2-nodes.