1 Survey has no fixed points. Therefore I've fixed AA1 at (0,0,0)
3 Removing trailing traverses...
5 Concatenating traverses...
11 Calculating traverses...
13 Calculating trailing traverses...
15 Calculating statistics...
17 Survey contains 5 survey stations, joined by 4 legs.
19 Total length of survey legs = 39.31m ( 39.31m adjusted)
20 Total plan length of survey legs = 38.72m
21 Total vertical length of survey legs = 6.55m
22 Vertical range = 6.55m (from AA1 at 0.00m to AA5 at -6.55m)
23 North-South range = 24.79m (from AA5 at 24.79m to AA1 at 0.00m)
24 East-West range = 29.60m (from AA5 at 29.60m to AA1 at 0.00m)