Update for 1.2.31
[survex.git] / tests / cmd_fix_bad.out
blob9faf8707c5038af4b242c424123a2b801837d48e
1 ./cmd_fix_bad.svx:2:9: error: Expecting numeric field, found ""
2  *fix A 0
3          ^
4 ./cmd_fix_bad.svx:3:11: error: Expecting numeric field, found ""
5  *fix B 0 0
6            ^
7 ./cmd_fix_bad.svx:4:30: error: Expecting numeric field, found ""
8  *fix C 0 0 0 1.0 2.0 3.0 3.14
9                               ^
10 ./cmd_fix_bad.svx:5:35: error: Expecting numeric field, found ""
11  *fix D 0 0 0 1.0 2.0 3.0 3.14 2.18
12                                    ^
13 ./cmd_fix_bad.svx:6:8: error: Expecting numeric field, found "test"
14  *fix E test
15         ^~~~
16 ./cmd_fix_bad.svx:8:20: error: Expecting numeric field, found ""
17  *fix Ar reference 0
18                     ^
19 ./cmd_fix_bad.svx:9:22: error: Expecting numeric field, found ""
20  *fix Br reference 0 0
21                       ^
22 ./cmd_fix_bad.svx:10:41: error: Expecting numeric field, found ""
23  *fix Cr reference 0 0 0 1.0 2.0 3.0 3.14
24                                          ^
25 ./cmd_fix_bad.svx:11:46: error: Expecting numeric field, found ""
26  *fix Dr reference 0 0 0 1.0 2.0 3.0 3.14 2.18
27                                               ^
28 ./cmd_fix_bad.svx:12:19: error: Expecting numeric field, found "test"
29  *fix Er reference test
30                    ^~~~
31 ./cmd_fix_bad.svx:14:31: error: Standard deviation must be positive
32  *fix W1 reference 123 456 789 0
33                                ^
34 ./cmd_fix_bad.svx:15:31: error: Standard deviation must be positive
35  *fix W2 reference 123 456 789 0 0
36                                ^
37 ./cmd_fix_bad.svx:16:31: error: Standard deviation must be positive
38  *fix W3 reference 123 456 789 0 0 0
39                                ^
40 ./cmd_fix_bad.svx:17:32: error: Standard deviation must be positive
41  *fix W1m reference 123 456 789 -1
42                                 ^~
43 ./cmd_fix_bad.svx:18:32: error: Standard deviation must be positive
44  *fix W2m reference 123 456 789 -1 -1
45                                 ^~
46 ./cmd_fix_bad.svx:19:32: error: Standard deviation must be positive
47  *fix W3m reference 123 456 789 -1 -1 -1
48                                 ^~
49 ./cmd_fix_bad.svx:20:32: error: Standard deviation must be positive
50  *fix W1o reference 123 456 789 -1 0
51                                 ^~
52 ./cmd_fix_bad.svx:21:32: error: Standard deviation must be positive
53  *fix W2o reference 123 456 789 0 -1
54                                 ^
55 ./cmd_fix_bad.svx:22:32: error: Standard deviation must be positive
56  *fix W3o reference 123 456 789 0 -1 -1
57                                 ^
58 ./cmd_fix_bad.svx:23:32: error: Standard deviation must be positive
59  *fix W4o reference 123 456 789 -1 0 -1
60                                 ^~
61 ./cmd_fix_bad.svx:24:32: error: Standard deviation must be positive
62  *fix W5o reference 123 456 789 -1 -1 0
63                                 ^~
64 ./cmd_fix_bad.svx:25:32: error: Standard deviation must be positive
65  *fix W6o reference 123 456 789 0 0 -1
66                                 ^
67 ./cmd_fix_bad.svx:26:32: error: Standard deviation must be positive
68  *fix W7o reference 123 456 789 0 -1 0
69                                 ^
70 ./cmd_fix_bad.svx:27:32: error: Standard deviation must be positive
71  *fix W8o reference 123 456 789 -1 0 0
72                                 ^~
73 ./cmd_fix_bad.svx:28:31: error: Standard deviation must be positive
74  *fix X1 reference 123 456 789 0 0.1
75                                ^
76 ./cmd_fix_bad.svx:29:35: error: Standard deviation must be positive
77  *fix X2 reference 123 456 789 0.1 0
78                                    ^
79 ./cmd_fix_bad.svx:30:32: error: Standard deviation must be positive
80  *fix X1m reference 123 456 789 -0.1 0.1
81                                 ^~~~
82 ./cmd_fix_bad.svx:31:36: error: Standard deviation must be positive
83  *fix X2m reference 123 456 789 0.1 -0.1
84                                     ^~~~
85 ./cmd_fix_bad.svx:32:31: error: Standard deviation must be positive
86  *fix Y1 reference 123 456 789 0 0.1 0.1
87                                ^
88 ./cmd_fix_bad.svx:33:35: error: Standard deviation must be positive
89  *fix Y2 reference 123 456 789 0.1 0 0.1
90                                    ^
91 ./cmd_fix_bad.svx:34:39: error: Standard deviation must be positive
92  *fix Y3 reference 123 456 789 0.1 0.1 0
93                                        ^
94 ./cmd_fix_bad.svx:35:31: error: Standard deviation must be positive
95  *fix Y4 reference 123 456 789 0 0 0.1
96                                ^
97 ./cmd_fix_bad.svx:36:31: error: Standard deviation must be positive
98  *fix Y5 reference 123 456 789 0 0.1 0
99                                ^
100 ./cmd_fix_bad.svx:37:35: error: Standard deviation must be positive
101  *fix Y6 reference 123 456 789 0.1 0 0
102                                    ^
103 ./cmd_fix_bad.svx:38:32: error: Standard deviation must be positive
104  *fix Y1m reference 123 456 789 -1 0.1 0.1
105                                 ^~
106 ./cmd_fix_bad.svx:39:36: error: Standard deviation must be positive
107  *fix Y2m reference 123 456 789 0.1 -1 0.1
108                                     ^~
109 ./cmd_fix_bad.svx:40:40: error: Standard deviation must be positive
110  *fix Y3m reference 123 456 789 0.1 0.1 -1
111                                         ^~
112 ./cmd_fix_bad.svx:41:32: error: Standard deviation must be positive
113  *fix Y4m reference 123 456 789 -1 -1 0.1
114                                 ^~
115 ./cmd_fix_bad.svx:42:32: error: Standard deviation must be positive
116  *fix Y5m reference 123 456 789 -1 0.1 -1
117                                 ^~
118 ./cmd_fix_bad.svx:43:36: error: Standard deviation must be positive
119  *fix Y6m reference 123 456 789 0.1 -1 -1
120                                     ^~
122 Removing trailing traverses...
124 Concatenating traverses...
126 Simplifying network...
128 Calculating network...
130 Calculating traverses...
132 Calculating trailing traverses...
134 Calculating statistics...
136 Survey contains 1 survey station, joined by 0 legs.
137 There are 0 loops.
138 Total length of survey legs =    0.00m (   0.00m adjusted)
139 Total plan length of survey legs =    0.00m
140 Total vertical length of survey legs =    0.00m
141    1 0-node.
142 There were 0 warning(s) and 40 error(s) - no output files produced.