sched: Make sure task has correct sched_class after policy change
From the code in rt_mutex_setprio(), it is evident that the
intention is that task's with a RT 'prio' value as a consequence
of receiving a PI boost also have their 'sched_class' field set
to '&rt_sched_class'.
However, Peter noticed that the code in __setscheduler() could
result in this intention being frustrated. Fix it.
Reported-by: Peter Williams <pwil3058@bigpond.net.au>
Signed-off-by: Peter Zijlstra <a.p.zijlstra@chello.nl>
Cc: Mike Galbraith <efault@gmx.de>
LKML-Reference: <
1257880321.4108.457.camel@laptop>
Signed-off-by: Ingo Molnar <mingo@elte.hu>